"The Harting Technology Group is a leading international supplier of industrial connection technology for the three lifelines data, signal and power with 13 production facilities and 44 sales companies worldwide" (www.harting.com/unternehmen). As a family-owned company with a long tradition spanning more than seven decades, ecological responsibility is a fundamental component of the Harting Technology Group's actions. Thus, the course towards wastewater-free production with the VACUDEST process was set early on at the main plant in Espelkamp. This fundamental decision in favour of ecologically sensible action in combination with economic considerations was also already supported during the company's development in China.
Internationally leading supplier of industrial connection technology for the three lifelines Data, Signal and Power.
At the Harting plant in Switzerland, Harting AG in Biel, production had to be expanded and an investment in the existing wastewater plant was necessary. Up to now, the legally compliant wastewater treatment has been carried out using the classic method of chemical-physical treatment with precipitation, flocculation and filtration via a chamber filter press. Subsequently, the heavy metal-free but saline wastewater was discharged into the local sewerage system. The sludge, which was produced during the pressing process and still contains a lot of water, was disposed of externally.
With regard to the new investment and the leading environmental idea, the Harting company was faced with an important question. Should the legally compliant, but meanwhile outdated technology be modernized and adapted to the expanded production - or should a completely new, modern and sustainable concept be preferred? After thoroughly weighing up all the arguments: suitability, reliability, ease of operation, cost-effectiveness and, last but not least, environmental benefits, the decision was made in favour of the vacuum evaporation system from H2O. This decision was also made easier by the experience with H2O and the VACUDEST system in the Harting plants in Espelkamp (D) and Guangdong (CN).
After detailed consultation and analysis of the process water streams, the process analysis was carried out in the laboratory of H2O GmbH in Steinen using a representative water sample. Here it already became apparent that the evaporation residues could possibly be used in a metallurgical plant. This was also confirmed in practice. In addition, the nickel emissions in the waste water could be reduced to zero, which was almost impossible with the old, conventional precipitation/flocculation process.
To implement the wastewater concept, Harting AG ordered a VACUDEST L 3.000, which was delivered in the highly corrosion-resistant version (material level 2) due to the expected salt concentrations. H2O GmbH was able to integrate several components and containers from the existing, and in the meantime partially deconstructed, waste water plant into the new waste water concept, so that a further savings potential could be realized. Due to the competent and good cooperation with the employees at the location Biel, it was possible to install the VACUDEST cleanly and to put it into operation very quickly, despite the partly tight space conditions.
To implement the wastewater concept, Harting AG ordered a VACUDEST L 3.000, which was delivered in the highly corrosion-resistant version (material level 2) due to the expected salt concentrations. H2O GmbH was able to integrate several components and containers from the existing, and in the meantime partially deconstructed, waste water plant into the new waste water concept, so that a further savings potential could be realized.
您对我们的VACUDEST系统感兴趣?
欢迎您和我们联系!
联系电话:
陆献君 (Ricky Luk)
销售顾问
电话: +86 512 3685 38-10 - 819
ricky.luk@h2o-de.com
您需要购买耗材, 配件, 或者预约检修?
我们期待为您服务!
联系电话:
周晓莉 (Shirley Zhou)
出纳
电话: +86 512 368538-10 820
shirley.zhou@h2o-de.com
您想加入我们的团队, 与我们一起共同塑造零污水的未来吗?
请与我们的人力资源部门联系!
Ihr Ansprechpartner:
Bettina Böhringer
女士
+49 7627 9239-201
career@h2o-de.com